sorry for the picture quality, he would not be still for the camera to focus *sigh*
Last week, the Boybarian loaded his quilt on the frame. This week I had his start quilting. He is a speed demon with his quilting and had HUGE toe catching stitches. He has already unsewn two rows...so he has one row quilted and mom has learned that 12 year old boys like speed (rather, this fact was emphasized!). I'm hoping we can slow him down for the next rows so that he doesn't have to spend much more time unsewing his quilting stitches (since *I* get roped in to help!).
Last week, the Boybarian loaded his quilt on the frame. This week I had his start quilting. He is a speed demon with his quilting and had HUGE toe catching stitches. He has already unsewn two rows...so he has one row quilted and mom has learned that 12 year old boys like speed (rather, this fact was emphasized!). I'm hoping we can slow him down for the next rows so that he doesn't have to spend much more time unsewing his quilting stitches (since *I* get roped in to help!).
1 comment:
Good for him!!
Post a Comment